Portugal Data Center Market Investment Analysis & Growth Opportunities Report 2025-2030: Portugal's Data Center Market to Triple in Size, Reaching USD 3.09 Billion by 2030 - ResearchAndMarkets.com

July 04, 2025 --

The "Portugal Data Center Market - Investment Analysis & Growth Opportunities 2025-2030" report has been added to ResearchAndMarkets.com's offering.

The Portugal Data Center Market was valued at USD 947 Million in 2024, and is projected to reach USD 3.09 Billion by 2030, rising at a CAGR of 21.84%.

KEY HIGHLIGHTS

  • In 2024, Portugal accounted for approximately 0.8% of Western Europe's total power usage, and this share is projected to rise to 3.4% by 2030. This expected growth is largely driven by the increasing number of data center installations, which are significantly boosting the country's power capacity requirements.
  • As of March 2025, the total live IT power capacity in the country was about 47.5 MW, with over 310 MW of power capacity currently in the development and planning stages. The existing power capacity represents just over 15% of the overall upcoming power capacity in the Portugal data center market.
  • In April 2025, a major power outage impacted Portugal and other parts of Europe, causing widespread disruptions, including to data center operations. However, Start Campus maintained uninterrupted services by relying on its sustainable backup system powered by renewable fuel (HVO) for local energy storage, ensuring continuous and reliable operations during the blackout.
  • Cloud services are expected to grow rapidly in the country, with increasing adoption across various sectors such as BFSI, retail, and healthcare. A key example is Banco Atlantico Europa, which became the first bank in the country to migrate its core banking system to the cloud, highlighting the growing trend of digital transformation through cloud technology.

WHY SHOULD YOU BUY THIS RESEARCH?

  • Market size available in the investment area, power capacity, and the Portugal colocation market revenue.
  • An assessment of the data center investment in Portugal by colocation, hyperscale, and enterprise operators.
  • Data center investments in the area (square feet) and power capacity (MW) across cities in the country.
  • A detailed study of the existing Portugal data center market landscape, an in-depth market analysis, and insightful predictions about the Portugal data center market size during the forecast period.
  • Snapshot of existing and upcoming third-party data center facilities in Portugal
    • Facilities Covered (Existing): 17
    • Facilities Identified (Upcoming): 06
    • Coverage: 6+ Cities
    • Existing vs. Upcoming (Data Center Area)
    • Existing vs. Upcoming (IT Load Capacity)
  • Data center colocation market in Portugal
    • Colocation Market Revenue & Forecast (2021-2030)
    • Retail Colocation Pricing
  • The Portugal data center landscape market investments are classified into IT, power, cooling, and general construction services with sizing and forecast.
  • A comprehensive analysis of the latest trends, growth rate, potential opportunities, growth restraints, and prospects for the market.
  • Business overview and product offerings of prominent IT infrastructure providers, construction contractors, support infrastructure providers, and investors operating in the market.
  • A transparent research methodology and the analysis of the demand and supply aspects of the industry.

PORTUGAL DATA CENTER MARKET VENDOR LANDSCAPE

  • The Portugal data center market features several global and regional data center operators providing colocation services. Notable operators include Equinix, AR Telecom, NOS Sistemas, REN, and others. Lisbon is the primary hub and a preferred location for data center development in Portugal.
  • Leading companies such as Start Campus, Equinix, and NOS are investing in large-scale and edge data centers across the Portugal data center market. All invest in sustainable, AI-ready facilities capable of supporting hyperscale workloads. Some of the new entrants in the Portugal data center market include AtlasEdge, Edged Energy in partnership with MERLIN Properties, Quetta Data Centers, and Templus.
  • In December 2024, Start Campus, a new player in the Portugal data center market, announced the launch of its first data center facility at its planned 1.2 GW campus in Sines, Portugal. The opening of this new data center is expected to attract further investment and innovation in the region, enabling hyperscale and cloud providers to leverage advanced data center capacity for their AI infrastructure.
  • Currently, there are no dedicated cloud regions operational in Portugal by major cloud operators such as Amazon Web Services (AWS), Microsoft, and Google. However, with the launch of hyperscale data center facilities, we anticipate that some of these companies will launch their own dedicated cloud regions in Portugal during the forecast period.

EXISTING VS. UPCOMING DATA CENTERS

  • Existing Facilities in the Region (Area and Power Capacity)
    • Lisbon
    • Other Cities
  • List of Upcoming Facilities in the Region (Area and Power Capacity)
    • Lisbon
    • Other Cities

IT Infrastructure Providers

  • Cisco
  • Dell Technologies
  • Fujitsu
  • Hewlett Packard Enterprise
  • IBM
  • Lenovo
  • NEC
  • NetApp
  • Oracle
  • Pure Storage

Data Center Construction Contractors & Sub-Contractors

  • ARSMAGNA
  • CAP DC
  • O/M
  • Proef
  • Quark
  • J. AGOSTINHO SILVA
  • SOMA PARALELA

Support Infrastructure Providers

  • ABB
  • Caterpillar
  • Daikin Applied
  • Ebm-Papst
  • Johnson Controls
  • Legrand
  • Schneider Electric
  • Siemens

Data Center Investors

  • Altice Portugal
  • AR Telecom
  • Equinix
  • NOS Sistemas
  • REN
  • Start Campus
  • WebTuga

New Entrants

  • AtlasEdge
  • Edged Energy
  • Quetta Data Centers
  • Templus

     

Key Attributes:

Report Attribute Details
No. of Pages 100
Forecast Period 2024 - 2030
Estimated Market Value (USD) in 2024 $947 Million
Forecasted Market Value (USD) by 2030 $3090 Million
Compound Annual Growth Rate 21.8%
Regions Covered Portugal

SEGMENTATION ANALYSIS

  • IT Infrastructure
    • Server Infrastructure
    • Storage Infrastructure
    • Network Infrastructure
  • Electrical Infrastructure
    • UPS Systems
    • Generators
    • Transfer Switches & Switchgears
    • PDUs
    • Other Electrical Infrastructure
  • Mechanical Infrastructure
    • Cooling Systems
    • Racks
    • Other Mechanical Infrastructure
  • Cooling Systems
    • CRAC and CRAH Units
    • Chillers Units
    • Cooling Towers, Condensers and Dry Coolers
    • Other Cooling Units
  • General Construction
    • Core & Shell Development
    • Installation & Commissioning Services
    • Engineering & Building Design
    • Fire Detection & Suppression
    • Physical Security
    • Data Center Infrastructure Management (DCIM)
  • Tier Standard
    • Tier I & Tier II
    • Tier III
    • Tier IV

For more information about this report visit https://www.researchandmarkets.com/r/o5jpb1

About ResearchAndMarkets.com

ResearchAndMarkets.com is the world's leading source for international market research reports and market data. We provide you with the latest data on international and regional markets, key industries, the top companies, new products and the latest trends.

Powered by EIN Presswire

Distribution channels:

Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.

Submit your press release